Ontario legislature eyes full shutdown for major renovations; likely to cost over $1B

At 130 years old, Ontario's legislature is showing its age.
There are lead pipes and asbestos running through the walls, mountains of old cables and wires stacked on top of new ones, an inefficient steam heating system with parts that frequently fail and fire safety systems in need of upgrading.
The "hazardous and severely deficient" infrastructure has members and officials of the legislature eyeing a full decommissioning of the building for large-scale renovations and moving the business of governing elsewhere for about eight years.
That's similar to the project underway in Parliament's Centre Block in Ottawa, and members of an Ontario legislative committee were set to travel to that city on Thursday to hear any lessons learned or best practices from officials there.
- Download our app to get local alerts on your device
- Get the latest local updates right to your inbox
A report is underway to determine exactly what work is needed, but it is clear it will not come cheap, said Legislative Affairs Minister Paul Calandra.
"It's certainly not going to cost less than a billion dollars," he said in an interview.
The vast scale of repairs and upgrades needed in the stately old legislature known as Queen's Park has been discussed on an increasingly urgent basis for the past several decades, with options on the table such as shutting it down block by block for the construction work.
That no longer seems like an option, Calandra said.
"We will need to decamp and (have) a full restoration happen, and that just can't happen in a piecemeal way and still have a functioning assembly at the same time, given the scale of what has to happen here," he said.
Speaker Ted Arnott said moving the assembly out of the building will end up being less disruptive and less expensive than doing it bit by bit.
"The longer we delay, the more likely it is that there's going to be, I would say, a catastrophic failure of one of our systems, whether it's plumbing or electrical, or ventilation," he said in an interview.
"We can't just let the building crumble around us."
Ontario Finance Minister Charles Sousa delivers the Ontario 2016 budget at Queen's Park in Toronto on Thursday, February 25, 2016. THE CANADIAN PRESS/Nathan Denette
Calandra is involved in scouting a new location for the assembly and hopes that when the next provincial parliament convenes after the 2026 election, it will be in a different --relatively close -- spot.
"There is a recognition that four or five, maybe maximum six years, frankly ... that's when we basically hit the end of the lifespan of the building, and it starts becoming very, very challenging to maintain it," Calandra said.
"It's going to be sooner rather than later."
The legislature has been getting by with repairs so far, but a report from more than 10 years ago concluded that a "full replacement of all major systems" is needed, including better fire protection, as well as electrical, IT, plumbing, and heating and cooling systems.
"Upgrades of this scale and complexity are further complicated by designated substances, which are present throughout the building, including asbestos, lead and PCBs," Jelena Bajcetic, director of precinct properties, told the legislative committee studying the issue during a hearing in November.
"These issues present significant challenges for us in staying ahead of the maintenance curve ... As we continue to maintain the systems, it doesn't change the fact that the infrastructure as a whole is both hazardous and severely deficient."
The standing committee on procedure and house affairs is set to hear Thursday from the deputy clerk of administration, chief information officer and director of real property services for the House of Commons.
A woman delivers mail at Queen's Park in Toronto on Monday, December 18, 2017. THE CANADIAN PRESS/Nathan Denette
Jennifer French, the New Democrat who is the chair of the committee, said she is hoping to hear from the federal officials what the province will need to keep in mind as it embarks on this project and how best to make these big decisions.
"This is not uncharted territory, but it is new for Queen's Park," she said in an interview. "Obviously, it's a building that is pretty important to a lot of folks, and we want to make sure that it can serve Ontarians going forward."
The work that needs to be done will not benefit the current crop of politicians, but it is for parliaments of the future, said deputy clerk Trevor Day. That is why it is important to get all parties on board, he told the committee in November.
"We need it to be bigger than the current government," he said.
"It's going to take a while for this to take place. It's going to cost a lot of money. There very well may be times when the public is not happy with how that money is being spent. I see a benefit to it for the people of Ontario, but it's not tangible ... We want to prove to you that it's needed and we want to prove to you that it's worth the money."
This report by The Canadian Press was first published Feb. 9, 2023.
CTVNews.ca Top Stories
Ottawa board of health member sees outpouring of support after body-shaming message
A member of the city of Ottawa's board of health is speaking out about body shaming after receiving a letter that said she shouldn't serve on the board because of her weight.

'Targeted inflation relief' coming in 2023 federal budget, Freeland says
The coming 2023 federal budget will 'exercise fiscal restraint' while also making 'significant' investments in health and building Canada's clean economy, Deputy Prime Minister and Finance Minister Chrystia Freeland said Monday.
2 staff members, student suspect injured in stabbing at Halifax-area high school
Two staff members and a student -- who is also the suspect -- have been injured in a stabbing at a high school in Bedford, N.S., according to the Halifax Regional Centre for Education (HRCE).
Safety steps Airbnb renters can take -- and measures that operators must
A deadly fire that swept through a building in Old Montreal on Thursday where several apartments were being used as Airbnb units is raising safety concerns about short-term rental properties. Here are several steps guests can take to protect themselves.
'Absolutely disgusting': B.C. councillor speaks out after Sikh international student swarmed, beaten
An international student was swarmed and beaten by a group of people who ripped off his turban and dragged him across the sidewalk by his hair in Kelowna, B.C., Friday evening, according to a local politician.
Unanswered questions: Montreal mayor calls for meeting with Airbnb after fatal fire
Mayor Valerie Plante said Monday she requested a meeting with an Airbnb executive after a building in Old Montreal — a short-term rental hot spot — was destroyed by a fire that has left six people missing.
W5 Investigates | How did a healthy teen die at a minor hockey camp?
The parents of young Ontario hockey player Ben Teague have been searching for answers since he died while at a team retreat in 2019. The mystery about what happened and the code of silence in hockey culture is explored in CTV W5's 'What Happened to Ben,' on CTVNews.ca and W5's official YouTube channel.
Patients seeking PRP therapy for COVID-related hair loss, but does it work?
Experts say a growing number of people are seeking out platelet-rich plasma therapy to treat COVID-19-related hair loss. But how well does the treatment actually work?
Will Poilievre's foreign interference motion be a confidence vote? Liberals 'having ongoing discussions'
In an effort to keep the foreign interference story at the forefront, and to do an apparent end run around the Liberal filibuster blocking one study from going ahead, Conservative Leader Pierre Poilievre forced the House to spend Monday debating a motion instructing an opposition-dominated House committee to strike its own review.