The Ontario Science Centre hosted a wedding the day after its dramatic shutdown
The day after the doors of the Ontario Science Centre closed to the public on the grounds that its roof was failing and unsafe, the centre’s management made an exception to allow a wedding and reception on its grounds.
Groom James Hewson told CTV News he’s incredibly grateful that his wedding – planned for months – could still go ahead, though he admits he can’t square that exception with the public messaging around the building’s dramatic shutdown.
“They told us, ‘Don’t listen to what you hear on the news, the building is safe. The only danger is the snow, and that’s no danger anytime soon,’” Hewson said in an interview.
“One of the staffers told me that it was someone high above that made sure our wedding went ahead. I don’t know who that could have been. I can’t help but thank them,” he said.
It’s another strange twist to the story of how the provincial government pointed to an engineering report they claimed said the Science Centre was unsafe to occupy, even though critics – including the firm that designed the building – said the report gave other options to safely maintain the building.
A Science Centre spokesperson said in a statement that staff are still allowed in the building as they vacate the building and ensure exhibits are properly managed and stored before October 31.
“As the decant was not yet fully underway and this event did not conflict with any immediate measures, the exception was made and the wedding proceeded safely as scheduled,” said Laura Berkenblit.
Photos show Hewson and his bride Sarah smiling outside of the Science Centre, and then experiencing the exhibits inside. He said the pair had a long history with the building and loved it enough to want to get married there.
“It was an incredible night. Even more incredible for all our guests. And it was a bittersweet feeling. We’re so sad that it’s closing,” he said.
“It’s an honour to be a part of the Science Centre history. As much as I’ll always have that great memory of the wedding night at the Science Centre, I would give that up to keep it open,” he said.
Reached at an unrelated news conference Wednesday, Deputy Premier Sylvia Jones stuck to the province’s line.
“It would not be appropriate for us to ignore some very clear engineering advice that suggested structurally the building is unsound,” Jones said. She ignored a reporter’s question that pointed out the building withstood strong rainfall last week.
The government has said rebuilding Ontario place would cost north of $500 million. It’s searching for an interim location before a new Science Centre can be built at Ontario Place in by 2029.
It’s also searching for a second building for the manufacture of exhibits the Science Centre has leased to other facilities all over the world.
Elsa Lam of Canadian Architect Magazine said government documents indicate just the main interim space alone could cost between $35 and $58 million dollars.
Meanwhile, the first engineering report estimated fixing the roof of the Science Centre would take around $24 million over ten years. Even a full rebuild would cost closer to $200 million, she said, when a factor of 185% for complexity and other costs was taken away.
“They made Ontario Place look as inexpensive as possible and they made the repairs to the Ontario Science Centre look as expensive as possible,” Lam said.
When asked about the Science Centre Monday, Ontario Premier Doug Ford dug in to the plan.
“We’re building a brand spanking new, state of the art, more exhibit space and in the right location, not in a sleepy little neighbourhood in the suburbs that no one goes to,” Ford said.
CTVNews.ca Top Stories
BREAKING Israeli military says it has carried out a 'targeted strike' in Beirut
The Israeli military said it carried out a 'targeted strike' in the Lebanese capital Beirut on Friday.
'It's disgusting': Quebec minister reacts after body of boy, 14, found near Hells Angels hideout
The province's public security minister said he was "shocked" Thursday amid reports that a body believed to be that of a 14-year-old boy was found this week near a Hells Angels hideout near Quebec City.
Woman nearly shut out of mother's will sues brother in B.C. Supreme Court – and wins
Since she was a young girl growing up in Vancouver, Ginny Lam says her mom Yat Hei Law made it very clear she favoured her son William, because he was her male heir.
Cognitive decline reduced by MIND diet, especially for women and Black people, study finds
Following the MIND diet for 10 years produced a small but significant decrease in the risk of developing thinking, concentration and memory problems, a new study found.
Ontario man to pay $1,500 surcharge after insurer says his SUV is at higher risk of theft
An Ontario man says it is 'unfair' to pay a $1,500 insurance surcharge because his four-year-old SUV is at a higher risk of being stolen.
Montreal couple facing deportation to Mexico granted temporary residency
The Montreal couple from Mexico and their three children facing deportation have received a temporary residence permit.
Federal firearm buyback program has cost $67M, still not collecting guns after 4 years
The federal firearm buyback program has cost taxpayers nearly $67.2 million since it was announced in 2020, but it still hasn't collected a single gun.
Lawyers say former Harrods boss Al Fayed was a 'monster' who abused women and girls
Lawyers representing dozens of women who say they were raped and sexually abused by Mohamed Al Fayed, the former boss of the famous London department store Harrods, said the case was akin to the crimes of sex offenders Jimmy Savile, Jeffrey Epstein and Harvey Weinstein.
NEW Health data collected from Indigenous Peoples in Canada has a dark history. One Indigenous company is turning that around
Software company Mustimuhw Information, which develops medical records systems built on a foundation of Indigenous traditions and values, is allowing health providers to capture data informed by cultural practices.