Subway maintenance and a Gardiner closure may slow your commute over the weekend.

Event closures

The Becel Heart and Stroke Ride for Heart cycling event will shut down parts of the Gardiner Expressway and the Don Valley Parkway on Sunday, from 2 a.m. to 2 p.m. The Gardiner will be closed from Carlaw Avenue to Highway 427, and the DVP will be closed from Highway 401 to the Gardiner.

There will be rolling road closures along the parade route of those participating in the Walk for Values, starting at Nathan Phillips Square at 11 a.m. on Sunday. The parade route is as follows:

  • North on University Avenue to Gerrard Street West
  • East on Gerrard to Yonge Street
  • South on Yonge to Queen Street West
  • West on Queen to Nathan Phillips Square

Major road closures

Northbound and southbound left lanes will be occupied on Park Lawn Road due to road widening, resurfacing and sidewalk construction, overnight every day until June 30.

Allen Road closure

The northbound and southbound curb lanes will be occupied at Lawrence Avenue West from 10 a.m. to 3 p.m. until June 1 due to engineering surveying.

The northbound curb lane at Lawrence Avenue West will be occupied from 11 p.m. Friday to 5 p.m. Saturday due to fence replacement and installation

Gardiner Expressway closures

In addition to the Ride for Heart closure, the westbound Gardiner off-ramp to Lower Sherbourne Street will be occupied until April 2016 due to road reconstruction.

A map of all planned road restrictions in the city is available online.

TTC closures

There will be no subway service on Line 1 between Downsview and St. Clair West Stations on Saturday and Sunday. Shuttle buses will be in operation, however, will not enter Eglinton West Station due to road construction. The bus will stop at the intersection of Bathurst Street and Eglinton Avenue West.

Subway closure

A full list of closures and service disruptions is available online